All things being equal, we ship based on order date. There are some “unequal” exceptions that affect date, such as:
- model ordered
- location
- helping with the development of the product
In the latter category (the one you’ve probably seen people posting about), we’ve delayed about 100 people from their scheduled ship date and accelerated about 100.
No, unfortunately, we haven’t done that. We wanted to, but when we scoped the project we realized the logistics resources to create & track it, and the software to surface it, are fully committed to scaling production.